How much anti-termite emulsion a plinth or foundation needs
Pre-construction anti-termite treatment under Indian practice is a continuous chemical barrier in the soil, not a spray on the finished paint. IS 6313 (Part 2), Code of practice for anti-termite measures in buildings — pre-constructional chemical treatment measures, is the document estimators reach for. The 2001 text (still widely cited in tenders, with a 2022 fourth revision on the BIS catalogue) tells you both which emulsion strength to mix and how many litres of that emulsion each square metre should receive.
Rates this page starts from
Clause 7 of IS 6313-2:2001 asks for the chemical emulsion to be applied uniformly at the prescribed dosage. For masonry foundations it sets 5 litres per square metre on the bottom surface and the sides of excavations up to about 300 mm height, and 7.5 litres per square metre on the backfill in immediate contact with the vertical face of the sub-structure. The top of the consolidated plinth filling, before the floor sub-grade goes down, is treated at the same 5 L/m² horizontal rate. Those two numbers — 5 and 7.5 — are the default rate boxes. They are editable if a later revision or a particular contract writes a different figure, but they are not invented here.
Default worked example
One hundred square metres of plinth-fill top at 5 L/m² needs 500.0 L of diluted emulsion. Chlorpyrifos 20 EC mixed to 1.0 percent active ingredient (the concentration IS 6313-2:2001 lists against IS 8944) means the concentrate is one-twentieth of the emulsion: 1 litre of 20 EC plus 19 litres of water. So 500 L of emulsion uses 25.00 L of concentrate and 475.00 L of water. Tick the vertical box and enter a perimeter and height only when you are also treating backfill faces; that quantity is then added at 7.5 L/m².
Safety and the law, briefly
These chemicals are not household cleaners. A licensed pest-control operator, the product label and the current BIS publication overrule a web calculator. Some older actives have faced regulatory restrictions; IS 6313’s later revisions discuss additional approved actives such as imidacloprid or bifenthrin at their own concentrations. This page lets you type the concentrate fraction so you are not locked to one trade name, but it will not tell you which product is currently permitted on your plot.
How to use the page
- Measure the horizontal surface you are treating today — pit bottoms, or the top of plinth filling — and keep the horizontal box ticked.
- Leave rates at 5 and 7.5 L/m² unless the specification in your hand says otherwise.
- Add vertical faces as a second, explicit step so you can see each share on the card.
- Mix only what you will apply before the emulsion settles, and never treat saturated or rain-soaked soil — the standard itself warns against that.
Earthworks volumes around the same foundation are on the excavation calculator. Isolated footing concrete is on the footing page.
IS 6313 (Part 2):2001 clauses 5.3 and 7.2: Chlorpyrifos 20 EC (IS 8944) at 1.0% a.i.; 5 L/m² on excavation bottoms and sides (~300 mm); 7.5 L/m² on backfill in contact with the foundation; later clauses treat the plinth-fill top at the horizontal rate. Public archived copy: law.resource.org (IS 6313-2:2001). BIS lists a 2022 fourth revision — prefer the current official text when writing a contract. 1% from a 20% EC is a 1:19 dilution (concentrate fraction 0.05).
Do not confuse this pre-construction barrier with a post-construction drill-and-inject job covered in other parts of IS 6313; the litres per hole are different. Keep children and pets off freshly treated soil. Wash equipment where the rinse cannot run into a well. If a tender quotes both “5 L/m² on horizontal” and a lump-sum litre figure, believe the measured area times the rate, then compare — lump sums sometimes assume a smaller house than the one you are building.